Eye Candy: Some of @MBuhari's Administration’s Laudable Projects.

We at #IPAN thought we should remind you, refresh your memories, educate, and most importantly, brighten your day with these photos.

If this thread spoils your day, we’re very sorry. It’s never our intention.

Modern Medical Diagnostic Centre at the Federal Medical Centre, Umuahia (FMCU), Abia State.
The 17-storey headquarters building of the Nigerian Content Development and Monitoring Board (NCDMB), located at Swali, Yenagoa, Bayelsa State.
Nnamdi Azikiwe Mausoleum (contract originally awarded in 1996, abandoned at various times, Buhari Administration revived the project in 2016, and completed it in 2018)
Rehabilitation, repair, and expansion of the runway of Akanu Ibiam International Airport, Enugu, Enugu State.
Enyimba City Special Economic Zone: Definitive Agreements signed between Federal Government, Abia State Government and Enyimba City Development Company Limited on December 7, 2018
The newly reconstructed Urasi River Bridge. The new bridge connects Nnewi in Anambra State to Orlu in Imo State.
Ariaria Market Electrification Project. The project brings stable and reliable electricity to all the 37,000 shops in Ariaria Market, by providing the Market with a gas-powered IPP).
Ikot Ekpene – Alaoji – Ugwuaji Switching Station and Transmission Line
The 2nd Niger Bridge
Pensions paid to Ex-Biafran Police: In 2017, the Buhari Administration paid 500 million Naira to clear pensions arrears that had not been paid since their presidential pardon in 2000
Energizing Education Programme is implemented in Fed Uni, Ebonyi and Nnamdi Azikwe Uni, Awka, Anambra. The Programme will provide these Universities with an Independent Power Plant, as well as upgrade existing distribution infrastructure, and also provide street-lighting.
Rehabilitation of 18km critical stretch of Onitsha–Awka Road (ongoing)
Rehabilitation of Sections 1 to 4 of the Enugu–Port Harcourt Expressway (Sukuk Bond) ongoing
Survival Fund
N-Power
TraderMoni

More from Society

It is simply not correct to point fingers at wind & solar energy as we try to understand the situation in TX. The system (almost) had a plan for weather (almost) like this. 1/x


It relied on very little wind energy - that was the plan. It relied on a lot of natural gas - that was the plan. It relied on all of its nuclear energy - that was the plan. 2/x

There was enough natural gas, coal and nuclear capacity installed to survive this event - it was NOT "forced out" by the wind energy expansion. It was there. 3/x

Wind, natural gas, coal and nuclear plants all failed to deliver on their expectations for long periods of time. The biggest gap was in natural gas! The generators were there, but they were not able to deliver. 4/x

It may be fair to ask why there is so much wind energy in ERCOT if we do NOT expect it to deliver during weather events like this, but that is an entirely different question - and one with a lot of great answers!! 5/x

You May Also Like

1/12

RT-PCR corona (test) scam

Symptomatic people are tested for one and only one respiratory virus. This means that other acute respiratory infections are reclassified as


2/12

It is tested exquisitely with a hypersensitive non-specific RT-PCR test / Ct >35 (>30 is nonsense, >35 is madness), without considering Ct and clinical context. This means that more acute respiratory infections are reclassified as


3/12

The Drosten RT-PCR test is fabricated in a way that each country and laboratory perform it differently at too high Ct and that the high rate of false positives increases massively due to cross-reaction with other (corona) viruses in the "flu


4/12

Even asymptomatic, previously called healthy, people are tested (en masse) in this way, although there is no epidemiologically relevant asymptomatic transmission. This means that even healthy people are declared as COVID


5/12

Deaths within 28 days after a positive RT-PCR test from whatever cause are designated as deaths WITH COVID. This means that other causes of death are reclassified as