One in four hydropower project sites along the Himalayan Rivers are likely to face severe damage from earthquake-triggered landslides, according to a research. #UttarakhandDisaster #earthquake @nivedita_Him @yamunajiye @Upadhyay_Cavita @Indian_Rivers @hridayeshjoshi

The research was conducted by researchers from the University of Potsdam, Germany, who compiled damages to 41 hydropower projects after Nepal’s 2015 #earthquake, and used that data to estimate earthquake-triggered damages to projects in other parts of #Himalayas. @yamunajiye
The model developed by the research team took into account the combined effect of ground shaking (Peak Ground acceleration) & river steepness (Mχ) and was applied to projects in Indian, Nepalese and Bhutanese #Himalayas.
@yamunajiye @hridayeshjoshi @nivedita_Him @Upadhyay_Cavita
The findings indicate that more than 10% of Himalayan rivers may be unsuitable for hydropower infrastructure given high probabilities of high co-seismic damages and ~25% of Hydropower projects are located along these reaches. #UttarakhandDisaster
#earthquake
The study points to an urgent need to re-evaluate hydropower development in the Himalayas. The model used in the study would also help in making a more accurate assessment of risks at locations for potential hydropower plants. #UttarakhandDisaster
Nepal lost at least 20% of it's hydropower capacity in the 2015 Gorkha #earthquake which killed nearly 9000 people and damaged more than 31 hydropower projects. It was not the ground shaking that damaged these HPPs. Landslides triggered by earthquake caused maximum losses.
These hydropower projects survived the earthquake but got wiped out by the debris highlighting that sites located along steep rivers with towering sidewalls were prone to becoming unstable during strong seismic ground shaking.
The study calls for an urgent need to assess the vulnerability of hydropower infrastructure to the risk of nature's extreme events.
To assess individual HPP sites, the results need to be refined by detailed geomorphological seismic hazard appraisals, as well as risk analyses that include site- specific economic considerations such as HPP life-cycle cost assessments. @yamunajiye
HPP hazard assessment needs to consider the seismic and geomorphic setting conjunctively. To this end, this knowledge will be required to mitigate the impacts of #earthquake on water - energy security in the future.
#UttarakhandDisaster #Tapovan

More from Society

You May Also Like

@franciscodeasis https://t.co/OuQaBRFPu7
Unfortunately the "This work includes the identification of viral sequences in bat samples, and has resulted in the isolation of three bat SARS-related coronaviruses that are now used as reagents to test therapeutics and vaccines." were BEFORE the


chimeric infectious clone grants were there.https://t.co/DAArwFkz6v is in 2017, Rs4231.
https://t.co/UgXygDjYbW is in 2016, RsSHC014 and RsWIV16.
https://t.co/krO69CsJ94 is in 2013, RsWIV1. notice that this is before the beginning of the project

starting in 2016. Also remember that they told about only 3 isolates/live viruses. RsSHC014 is a live infectious clone that is just as alive as those other "Isolates".

P.D. somehow is able to use funds that he have yet recieved yet, and send results and sequences from late 2019 back in time into 2015,2013 and 2016!

https://t.co/4wC7k1Lh54 Ref 3: Why ALL your pangolin samples were PCR negative? to avoid deep sequencing and accidentally reveal Paguma Larvata and Oryctolagus Cuniculus?